<p id="dfvvt"></p>

    <noframes id="dfvvt">

      <thead id="dfvvt"></thead>
        <address id="dfvvt"></address>
        <mark id="dfvvt"></mark>
        <listing id="dfvvt"></listing>
        print this page email this page go to the top of the page
        Home
        Contact Us
        Sitemap
        Projects Executed
        Photo Gallery
        Water Development Department
        Client:
        Water Development Department
        Architect:
        Alecos Gavrielides
        Duration: 2 years
        Commencement Date: 2006
        Completion Date: 2008
        Details

        This was a Build-Operate-Own Project and was constructed in Joint Venture between GCC Ltd. and CHAPO.  The building consists of 6,500 m2 of office space, including electromechanical installations and external works.

        The Architect of the Project was Alecos Gavrielides and the Building was handed over to the Water Development Department at the end of June 2008.

        Back to Projects Executed
        © 2008 GCC Ltd |  Disclaimer Design & Development by BDigital | Powered by WebStudio